Preview

Oil and Gas Studies

Advanced search

Determination of lower break-out of the boom on wells equipped plunger pump

https://doi.org/10.31660/0445-0108-2022-1-96-107

Abstract

Development of fields at a late or final stage of exploitation of the Ural-Volga region is carried out mainly with the use of downhole sucker rod pumping units. The most typical failures for these installations are rods breaks and breaks and pump valve malfunctions. Methods for eliminating these accidents vary significantly: a break or a breakaway of the rods involves lifting the downhole equipment, and the "sticking" of the shut-off element of the pump valve assembly is eliminated by the "resuscitation" of the downhole equipment (flushing with water, hot oil or solvent). An error in recognizing a malfunction leads to incorrect planning of work to restore the operability of downhole equipment, and, as a result, to economic losses.
The cause of the downhole equipment malfunctions of the sucker rod pumping units is usually determined by analyzing the dynamogram. However, in many cases dynamometer charts don't distinguish between the bottom flap of the rods and the failure of the sucker rod pump valves. In the article, a method of prompt determination of rod breakage and breakaway in a well is considered, which consists in creating an electrical circuit "rod string - tubing string" and monitoring its integrity. To determine the type of malfunction, the synchronization unit via the electromagnetic channel measures the resistance of the system on the dielectric insert. In case of break-off of rods, the electrical resistance of the "tubing-pump-rod string" circuit will be much higher (more than 2 ohms) than in the absence of this failure (0...2 ohms).

About the Authors

A. S. Galeev
Almetyevsk State Oil Institute
Russian Federation

Akhmetsalim S. Galeev, Doctor of Engineering, Professor at the Department of Oil and Gas Equipment and Engineering Technology

Almetyevsk



G. I. Bikbulatova
Almetyevsk State Oil Institute
Russian Federation

Goliya I. Bikbulatova, Candidate of Engineering, Associate Professor at the Department of Oil and Gas Equipment and Engineering Technology

Almetyevsk



S. L. Sabanov
Almetyevsk State Oil Institute
Russian Federation

Sergey L. Sabanov, Associate Professor at the Department of Oil and Gas Equipment and Engineering Technology

Almetyevsk



Yu. A. Boltneva
Almetyevsk State Oil Institute
Russian Federation

Yulia A. Boltneva, Senior Lecturer at the Department of Oil and Gas Equipment and Engineering Technology

Almetyevsk



O. A. Shipilova
Almetyevsk State Oil Institute
Russian Federation

Olga A. Shipilova, Candidate of Engineering, Associate Professor at the Department of Oil and Gas Equipment and Engineering Technology

Almetyevsk



References

1. Takacs, G. (2015). Sucker-Rod Pumping Handbook: Production Engineering Fundamentals and Long-Stroke Rod Pumping. Gulf Professional Publishing, 598 p. (In English).

2. Gibbs, S. G. (1963). Predicting the Behavior of Sucker-Rod Pumping Systems. Journal of Petroleum Technology, 15(07), pp. 769-778. (In English). DOI: 10.2118/588-PA

3. Khalimov, F. G., Zubairov, S. G., Zagorskijj, V. K., Salikhov, I. A., & Kuramshin, A. A. (2011). Cause analysis and prevention of sucker rod and tubing back off. Neftegazovoye delo, (6), pp. 457-462. (In Russian). Available at: http://ogbus.ru/article/view/analiz-prichin-i-profilaktika-otvorotov-nasosnyx-shtang-i-trub

4. Sultanov, B. Z., & Shagaleev, R. K. (2009). Rod breakage of plunger pumping units in JSC Tatneft. Neftegazovoye delo, 7(2), pp. 68-70. (In Russian).

5. Sitdikov, M. R., Kochekov, M. A., & Ishemguzhin, I. E. (2010). Analiz obryvov shtang v NGDU "Chekmagushneft'". Innovatsionnoe neftegazovoe oborudovanie: problemy i resheniya: sbornik trudov Vserossiyskoy nauchno-tekhnicheskoy konferentsii. Ufa, October, 28-29, 2010, pp. 151-154. (In Russian).

6. Poplygin, V. V., & Lekomtsev, A. V. (2011). Dynamics of the wear of oil pumps with the operation of the wells of the Сhurakovskoe oilfield. Oil Industry, (9), pp. 22-28. (In Russian).

7. Ibragimov, R. R. (2019). Preventing the rod string reverse by applying flexible coupling group and anaerobic hermetical materials in Bashneft-Production Ltd. Petroleum Engineering, 17(1), pp. 50-55. (In Russian). DOI: 10.17122/ngdelo-2019-1-50-55

8. Doty, D. R. & Schmidt, Z. (1983). An Improved Model for Sucker Rod Pumping. Society of Petroleum Engineers Journal, 23(1)), pp. 33-41. (In English). DOI: 10.2118/10249-PA

9. Moisés, G. V., Andrade, S. F., & Garcia, A. C. (2010). Sucker-Rod Pumping Failures Diagnostic System. SPE Annual Technical Conference and Exhibition, Florence, Italy, September, 2010. (In English). Available at: https://doi.org/10.2118/134975-MS

10. Hakimyanov, M. I., & Pachin, M. G. (2011). Functional capabilities of modern sucker rod pumps controller. Petroleum Engineering, (2), pp. 19-34. (In Russian).

11. Bikbulatova, G. I., Yermilov, P. P., Boltneva, G. A., & Sabanov, S. S. (2015). The study of the influence of ultrasonic pulsed radiation at threaded connection tubing. Oil and Gas Territory, (6), pp. 58-64. (In Russian).

12. Jellison, M. J. & Hall, D. R. (2003). Intelligent Drill Pipe Creates the Drilling Network - SPE80454-MS, Society of Petroleum Engineers, SPE Asia Pacific Oil and Gas Conference and Exhibition, September, 9-11, Jakarta, Indonesia. (In English). Available at: https://doi.org/10.2118/80454-MS

13. Galeev, A. S., Grigoriev, V. M., Arslanov, R. I., & Ermilov, P. P. (2012). Possible application of wireless galvanic communication channel at the wells equipped with deep bottom holddown pumps. Modern fundamental and applied researches, (4(7)), pp. 44-48. (In Russian).

14. Galeev, A. S., Suleymanov, R. N., Arslanov, R. I., Bikbulatova, G. I., Boltneva, Yu. A. Pat. Device for transmitting information over an electromagnetic communication channel during operation of wells. Pat. RF 2696954. No. 2018111891. Applied: 02.04.18. Published: 07.08.19. Bulletin No. 22. (In Russian).

15. Galeev, A. S., Bikbulatova, G. I., Suleymanov, R. N., Filimonov, O. V., Sabanov, S. L., & Boltneva, Yu. A. (2019). Station monitoring the state of the downhole suckerrod pumping unit. Oil and Gas Studies, (4), pp. 82-91. (In Russian). DOI: 10.31660/0445-0108-2019-4-82-91

16. Khakimyanov, M. I., Shafikov, I. N., Khusainov, F. F., Semisynov, R. A., & Bezryadnova, E. A. (2017). Monitoring of suckerrod pump units as a result of the analysis wattmeter cards. Journal of Physics: Conference Series, (803). Available at: https://doi.org/10.1088/1742-6596/803/1/012066 (In Russian).

17. Arslanov, R. I., Bikbulatova, G. I., Boltneva, Yu. A., Galeev, A. S., Sabanov, S. L., Suleymanov, R. N., & Filimonov, O. V. (2019). Investigation of conductivity (attenuation) of electrical signals of rectangular shape in the annular space "Tubing - column rods". Dostizheniya, problemy i perspektivy razvitiya neftegazovoy otrasli: materialy IV Mezhdunarodnoy nauchno-prakticheskoy konferentsii (Almetyevsk, October, 16-18, 2019). Almetyevsk, Almetyevsk State Oil Institute Publ., pp. 185-190. (In Russian).

18. Howsam, P., Misstear, B., & Jones, C. (1995). Monitoring, maintenance and rehabilitation of water supply boreholes. Construction Industry Research and Information Association (CIRIA), London (United Kingdom), 114 p. (In English).

19. Bikbulatova, G. I., Galeev, A. S., Valitov, M. Z., Sabanov, S. L., Boltneva, Y. A., & Shipilova, O. A. (2020). Implementation of wireless data transmission method on wells equipped with suckerrod pumping units. IOP Conf. Series: Materials Science and Engineering, 860. (In English). Available at: https://doi.org/10.1088/1757-899X/860/1/012027

20. Galeev, A. S., Suleymanov, R. N., Filimonov, O. V., & Shaykhraziev, S. R. Pat. RF 2753327. No 2018114619. Sposob i ustroystvo opredeleniya nizhnego obryva/otvorota shtang na skvazhinakh, oborudovannykh UShGN. No. 2018114619. Applied: 19.04.18. Published: 22.10.19. (In Russian).


Review

For citations:


Galeev A.S., Bikbulatova G.I., Sabanov S.L., Boltneva Yu.A., Shipilova O.A. Determination of lower break-out of the boom on wells equipped plunger pump. Oil and Gas Studies. 2022;(1):96-107. (In Russ.) https://doi.org/10.31660/0445-0108-2022-1-96-107

Views: 234


ISSN 0445-0108 (Print)