Preview

Oil and Gas Studies

Advanced search

PRIDICTION OF THE PRODUCTIVITY OF HYDRAULIC FRACTURED VERTICAL WELL WITH INFINITE CONDUCTIVITY FRACTURE

https://doi.org/10.31660/0445-0108-2017-5-96-99

Abstract

Hydraulic fracturing is used to significantly improve well productivity, particularly in reservoirs with low permeability. In carrying out this operation in the reservoir creates a large branched system of cracks. Increase filtration connection of the wells to remote areas. This article will present the results of numerical solution of the problem related to the definition of increasing the productivity of vertical wells after hydraulic fracturing, with infinite conductivity fracture. As a result, productivity index increases with penetration ratio distance for all aspect ratios.

About the Authors

S. A. Faiq
Industrial University of Tyumen; University of Technology
Russian Federation


A. V. Sarancha
Industrial University of Tyumen
Russian Federation


References

1. Ramey H. J., Cobb W. M. A General Pressure Buildup Theory for a Well in a Close Drainage Area // JPT. - 1971. - December. - P. 1493-1505.

2. Gringartin A. C. Reservoir Limit Testing for Fractured Wells // SPE 7452. - (October 1978).

3. Prats М. Effect of vertical fracture on reservoir behavior. Incompressible fluid case // SPEJ. - (June 1961). - P. 105-118.

4. Riley M. F., Brigham, W. E., Horne R. N. Analytical Solutions for Elliptical Finite-Conductivity Fractures // SPE 22656. - (October 1991).

5. Wilson C. Quantitative Methods in Reservoir Engineering. - Available at: https://www.elsevier.com.


Review

For citations:


Faiq S.A., Sarancha A.V. PRIDICTION OF THE PRODUCTIVITY OF HYDRAULIC FRACTURED VERTICAL WELL WITH INFINITE CONDUCTIVITY FRACTURE. Oil and Gas Studies. 2017;(5):96-99. (In Russ.) https://doi.org/10.31660/0445-0108-2017-5-96-99

Views: 410


ISSN 0445-0108 (Print)