Preview

Oil and Gas Studies

Advanced search

EFFECT OF OPERATING TIME OF THE WELLS IN THE STEADY DRAINAGE MODE BEFORE STOPPING ON THE RESULTS OF THE STUDY OF PRESSURE BUILD-UP CURVES

https://doi.org/10.31660/0445-0108-2017-1-48-50

Abstract

Operation time of the well before stopping for investigating the pressure recovery curve in hydrodynamic studies is an important parameter affecting the quality and accuracy of results of research processing. Comparing the actual and theoretical pressure curves and the derivative, it’s possible to eliminate the uncertainty in the choice of previous history of the well operation.

About the Author

E. F. Gilfanov
LUKOIL-Engineering Limited KogalymNIPIneft
Russian Federation


References

1. Bourdet D Well test analysis the use of advanced interpretation models. Paris. Elsevier - 2002 - 439p


Review

For citations:


Gilfanov E.F. EFFECT OF OPERATING TIME OF THE WELLS IN THE STEADY DRAINAGE MODE BEFORE STOPPING ON THE RESULTS OF THE STUDY OF PRESSURE BUILD-UP CURVES. Oil and Gas Studies. 2017;(1):48-50. (In Russ.) https://doi.org/10.31660/0445-0108-2017-1-48-50

Views: 393


ISSN 0445-0108 (Print)